Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM — Minutes

Open official source ↗ · Source page 8

SHA-256 020251ce8f2a943772828b8e59107b6d2213484ded8ab2b78e1f471b7f7d3d16 · Captured source extract

 
April 17, 2025 
6:00 PM 
 
City of Smyrna 
Mayor and Council Meeting 
2800 King Street SE 
Human Resources Training Room 
 
Page 8 of 10 
 
 30.    The shared sidewalk and road connections with the church property will be installed 
and constructed by the developer as shown on the 10/19/2021 site plan. 
 31.    The development shall provide appropriate turning radius for non-emergency 
commercial vehicles. 
 32.    The developer shall be responsible for any water and sanitary sewer improvements 
deemed necessary by the Public Works Director during construction plan review. 
 33.    The developer shall be responsible for any fire access improvements deemed 
necessary by the Fire Marshal during construction plan review. 
 34.    All trees within the limits of disturbance and not located within a tree protection area 
must be removed during the land clearing and grading phase of the development. 
 35.    Approval of the subject property for the RDA zoning district shall be conditioned 
upon the development of the property in substantial compliance with the site plan 
submitted 10/19/2021 3/14/2025 created by Planners and Engineers DGM Land Planning 
Consultants and all zoning stipulations above. 
 36.    The applicant shall be bound to the elevations submitted and dated 6/2/2021 
3/14/2025 and the exterior side wall elevations on 4/2/2025. Approval of any change to 
the elevations must be obtained from the Director of Community Development. 
 37.    Additional evergeen trees shall be planted in the landscape buffer with a minimum 
of 3-inch caliper. 
 38.    The minimum driveway length shall be 20 feet from the garage face to back of curb 
for Lots 1-3, and 22' for Lots 4-12. 
 39.    The maximum building height shall be 38 feet measured from the average elevation 
of the ground on all four sides to the midpoint between the eaves of the ridge on a sloped 
roof. 
 40.    Each home shall have a covered rear deck and the supporting posts shall be made 
of brick. 
 41.    The external side elevation for Lot 6 shall be all brick, and the external side 
elevations for Lots 1, 7, and 12 shall be a minimum one story of brick. 
 42.    The HOA shall maintain the landscape buffer adjacent to Argyle Estates to be free 
of bamboo. 
  
Councilmember Glenn Pickens returned to the HR Training Room after discussion ended 
at 6:40 PM. 
  
RES2025-008: Mayor Norton introduced the resolution for approving the 
Intergovernmental Economic Development Agreement with the Downtown Development 
Authority. The bod will allow the city to proceed with the purchase and future development 
plans for the site. There was discussion about potential uses for the site, including a 
pickleball facility and a hotel. The city plans to lease existing buildings on the site to 
current tenants while determining future use.  
  
ATH2025-067: Paul Osburn, Deputy Public Works Director, stated that this addresses the 
road resurfacing project funded by SPLOST and potential LRA funds (application in 
process). The project will resurface 10.94 miles of roadway focusing on roads in mid- to 
poor condition. The total cost of the project is $1.4M with significant savings compared to 
previous estimates. The project includes full-width mill and overlay, soil cement, and 
reclamation for structural failures. Curb repair is not included in this.  
  
ATH2025-069: Joe Bennett, City Administrator, stated that the City has completed several 
projects and needs to reallocate funding to other ARPA projects. We also need to 
establish project length budgets for several obligations that did not have an established 
budget.