FY2025 adopted budget book — official finance index
Open official source ↗ · Source page 168
SHA-256 101a5ab6208fc75e5911fa99b5fa5175d45ef4c357745e6b19b96bde993b5dcb · Captured source extract
City of Smyrna
NEXT YEAR BUDGET DETAIL REPORT
Report generated: 04/24/2024 12:53
User: loneal
Program ID: bgnyrpts
Page 1
PROJECTION: 2025 FY2025 Operating Budget
ACCOUNTS FOR:
GF-ENGINEERING VENDOR QUANTITY UNIT COST 2025 PROPOSED
521200 PURCH PROFESSIONAL SVCS
01442701 521200 - 175,000.00 *
Consulting fee for inspections, data 1.00 50,000.00 50,000.00
collection, and annual reporting for
MS4 stormwater permit.
Consulting engineering fees for 2.00 20,000.00 40,000.00
inspections of stormwater detention
facilities.
Consulting engineering fees for new 2.00 12,500.00 25,000.00
traffic signal studies and analysis.
Engineering design fees for drainage 4.00 15,000.00 60,000.00
studies and stormwater improvements.
TOTAL PURCH PROFESSIONAL SVCS 175,000.00
522200 REPAIRS & MAINTENANCE
01442701 522200 - 50,800.00 *
Annual bucket truck safety inspection 1.00 500.00 500.00
Engineering vehicles preventative 1.00 19,000.00 19,000.00
maintenance.
Maintenance for Nickajack silent RR 1.00 1,500.00 1,500.00
crossing.
Replacement of decorative light poles 1.00 29,800.00 29,800.00
within the public right-of-way.
TOTAL REPAIRS & MAINTENANCE 50,800.00
523200 COMMUNICATIONS
01442701 523200 - 7,500.00 *
City cell phone service 1.00 7,500.00 7,500.00
168