License and Variance Board Meeting - A. MAX BACON CITY HALL - COUNCIL CHAMBERS — Minutes

Open official source ↗ · Source page 13

SHA-256 1b44a1ddb57379aedf0c82e17a989834bd9322876c9aa49cdf5502c3f8c7395a · Captured source extract

 
December 10, 2025 
10:00 AM 
 
City of Smyrna 
License and Variance Board Meeting 
2800 King Street SE 
Council Chambers 
 
Page 13 of 20 
 
With the expanded driveway and shed, the impervious surface area is above the 
allowable 35% by 24.4% (or 2,683 square feet). The partial removal of the driveway (681 
square feet) will bring the impervious surface area down to 53.2%. After a review of the 
application, staff is also requiring an additional 561.8 square feet of concrete removal on 
the north and east sides of the home (as shown in Figure 3). After the removal of the 
561.8 square feet of sidewalk, the impervious surface area will be 48.1% for the lot square 
footage of 10,991 square feet. However, if the property were the required size of 15,000 
square feet, this would bring the impervious surface area down to the required maximum 
of 35% and thus staff can support the reduction. To offset the increase in impervious 
surface area, the applicant is adding an infiltration basin in the northeastern corner of the 
rear yard. The Engineering Department has reviewed the application and is supportive of 
the proposed mitigation method with the stipulation that a Stormwater Inspection & 
Maintenance Agreement be recorded prior to building permit issuance. 
  
A similar side setback variance was approved in 1976 for an accessory structure at 2710 
Ivanhoe Lane as well as an impervious surface increase earlier this year at 2790 Ivanhoe 
Lane (V25-009) so there is a precedence of these types of variances in the area. 
  
The applicant is requesting to deviate from the development standards established by the 
City for R-15 lots. According to Section 1403 of the Zoning Ordinance, variances must be 
reviewed under the following standards: (1) Whether there are unique and special or 
extraordinary circumstances applying to the property; (2) Whether any alleged hardship is 
self-created by any person having an interest in the property; (3) Whether strict application 
of the relevant provisions of the code would deprive the applicant of reasonable use of the 
property; and (4) Whether the variance proposed is the minimum variance needed. After a 
review of the standards above, Community Development believes that the variances will 
not adversely affect surrounding residents; therefore, staff recommends approval of the 
requested variances with the following conditions:  
 
1. Approval of the requested variances is conditioned upon substantial compliance 
with the site plan and elevations submitted with the variance application. 
2. A permit for the accessory structure and carport must be acquired within 30 days 
of variance approval. 
3. The driveway sections called out to be removed on the site plan must be removed 
prior to the issuance of the Certificate of Completion. Additionally, the concrete 
sidewalk along the left side and rear of the house (with the exception of a 3-foot x 
3-foot landing at the bottom of the stairs) shall be removed prior to issuance of the 
Certificate of Completion. 
4. A Stormwater Inspection and Maintenance Agreement shall be completed and 
recorded with the Cobb County Superior Court prior to issuance of the building 
permit. 
5. A stormwater as-built certification statement shall be submitted to Community 
Development for approval prior to issuance of the Certificate of Completion. 
6. The accessory structure shall not be rented or occupied for gain, except as 
permitted in Article IX of Chapter 22 as it pertains to the operation of short-term 
rental units. 
 
Chairperson Garland asked about V25-116 and V25-118. Mrs. Crowe explained that the 
additional concrete that staff is requiring does not affect the variances and minimum 
requirements. 
  
Board Member Worthy asked if the six stipulations go with all variance requests. Mrs. 
Crowe stated that if the applicant is not removing the northern concrete, the board can 
strike or add to stipulations.