GovernSmyrna.

Issue Sheet Z25-008

Open official source ↗ · Source page 2

SHA-256 58815a2ee5c4552a2e8b7bd2e680f4e2d822c74208152914a4960205c25cda41 · Captured source extract

City of Smyrna
Issue Sheet
File Number: Z25-008
A Max Bacon
City Hall
2800 King Street
Smyrna, GA 30080 
1
1
6
3
4. The developer shall be responsible for any traffic improvements (including additional right-of-way 
dedications) deemed necessary by either the City or the County during construction plan review. 
Sidewalks shall be provided by the developer inside the subdivision and outside the subdivision 
adjacent to any public right-of-way consistent with City’s requirements for the extent of the 
development. A grass buffer with a minimum width of 2’ shall be provided between the back of curb 
and sidewalk.
5. The development of any streets (including private) shall conform to the city's standards for public 
right-of-ways.
6. No debris may be buried on any lot or common area.
7. The developer will install decorative streetlights within the development, subject to approval by 
the city engineer. Utilization of low intensity, environmental type lighting, the illumination of which 
shall be confined within the perimeter of the subject property through the use of "full-cutoff lighting".
8. The developer will comply with the City’s current tree ordinance.  All required tree protection 
measures shall be adhered to by the developer during construction.
9. All landscape plans must be prepared, stamped, and signed by a Georgia Registered Landscape 
Architect for any common areas or entrances.
10. All yards and common areas are to be sodded, and landscaped. Irrigate as appropriate.
Special Conditions
11. The hotel shall maintain the following minimum building setbacks:
Front – 15’
Side – 20’
Rear – 0’
Maximum side – 180’
The multi-family building shall maintain the minimum building setbacks:
Front – 20’
Side – 15’
Rear – 40’
12. The developer shall meet all fire access requirements deemed necessary by the Fire Marshal 
during construction plan review.
13. The developer shall be responsible for any water and sewer improvements deemed necessary by 
the Public Works Director during construction plan review.