GovernSmyrna.

2025-04-21 April 21, 2025 Mayor and Council Meeting Minutes - FINAL

Open official source ↗ · Source page 5

SHA-256 5a0513cf2f21cdab07dff5665711f2ed5130197efa2d74127272c172be1cbdb3 · Captured source extract

 
April 21, 2025 
7:00 PM 
 
City of Smyrna 
Mayor and Council Meeting 
2800 King Street SE 
Council Chambers 
 
   Page 5 of 12 
8.    The development of any streets (including private) shall conform to the city's 
standards for public right-of-ways. 
9.    No debris may be buried on any lot or common area. 
10.    The developer will comply with the City's current tree ordinance (unless noted 
elsewhere). All required tree protection measures shall be adhered to by the 
developer during construction. 
11.    All landscape plans must be prepared, stamped, and signed by a Georgia 
Registered Landscape Architect for any common areas or entrances. 
12.    All yards and common areas are to be sodded, and landscaped. Irrigate as 
appropriate. 
  
 Special Conditions 
  
13.    The development shall maintain the following setbacks: 
          Front: 17' (Lot 1) 
                     19' (Lot 2) 
                     20' (Lots 3-12) 
           Side- 5' 
           Rear-10’ 0’ (Lots 1-12) 
14.    The proposed homes shall have a minimum floor area of 1,800 sq. ft. 
15.    The minimum lot size shall be 3,150 sq. ft. 
16.    The maximum impervious coverage shall be 58% per lot. 
17.    The minimum lot width shall be 35'. 
18.    The private drive shall be a minimum of 24' wide from back of curb to back of 
curb. 
19.    The developer shall provide right-of-way dedication on Campbell Road where 
required by the City Engineer. 
20.    The front elevations of Lots 1-6 shall face Campbell Road and the front 
elevations Lots 7-12 shall face the detention pond/open space area. The rear 
elevation shall be on the private street. 
21.    All homes shall have a two-car rear-entry garage. 
22.    Privacy fencing shall be prohibited within the development. Fencing within the 
front yard shall be a maximum 4' in height and decorative. 
23.    The front entrance to the development shall not be gated. 
24.    The development shall include a 10' landscape strip along Atlanta Road. 
25.    The development shall include a 50' landscape buffer along the northern 
boundary. The landscape buffer will include a 6' high planted berm, and no trees taller 
than 15' within 20' of the property line. 
26.    The developer shall be responsible for sidewalks along Atlanta Road and 
Campbell Road. 
27.    The existing detention pond will be modified by the developer to be an amenity 
feature with a passive recreational area; including walking trails and landscaping in 
accordance with the site plan dated 10/19/2021. 
28.    The developer shall be responsible for sidewalk and landscaping within the 
amenity area. 
29.    The developer shall be responsible for installation of the private roads within 
the development and will be privately maintained by the HOA. 
30.    The shared sidewalk and road connections with the church property will be 
installed and constructed by the developer as shown on the 10/19/2021 site plan. 
31.    The development shall provide appropriate turning radius for non-emergency 
commercial vehicles. 
32.    The developer shall be responsible for any water and sanitary sewer 
improvements deemed necessary by the Public Works Director during construction 
plan review.