for non-public works contracts, and $100,000 for public works contracts, but may change 
with future revisions to the policy. Finance is asking for formal approval to put this 
administrative approval in place. Anything over $100,000 for a unit price contract will 
always go through a formal bid process. 
  
CHOR2025-001: Eric Randall, Public Works Director, explained that as previously 
discussed, staff has worked with the contractor for options to create an aesthetic finish 
that can be more easily maintained to address the staining that has occurred on the wall 
surfaces for the Windy Hill Boulevard project. We have determined the most cost-effective 
solution is to treat the surfaces with a tinted coating, though this product has a higher unit 
cost because coverage is not as broad per gallon as the clear coat. The net increase in 
unit cost is $0.59/gallon. He stated that because of the cold weather, asphalt plants are 
not open. Realistically, this project will be substantially complete (finish work still being 
completed but open to traffic) by summer.  
  
CHOR2025-002: Mr. Randall also explained that after the pedestrian speed table was 
installed on the eastbound lanes at the westerly bridge of the Windy Hill Road project and 
the lane reopened to traffic, there was an apparent and obvious concern that the 
approach to the speed table was too steep and created a hazardous condition for drivers. 
City staff reviewed the conditions and design drawings and found that while both are 
consistent and within guidelines provided by the Georgia Department of Transportation, 
drivers have become accustomed to traveling faster than the design speed. This has 
created a potential safety hazard and liability. Working with the contractor we have 
developed a proposed solution to lengthen the approach ramp from 6’ to 10’, reducing the 
slope by 4% from 8.33% to 5.00%. Further, to reduce the time for which the lane will be 
closed to through traffic, the contractor proposes temporarily opening the right-hand 
eastbound through lane and closing the eastbound local lane from Friday, January 17, 
2025 at 8 pm and reopening the local lane by 5 am on Monday, January 20, 2025. Council 
expressed skepticism that this needed to be done because the construction is not 
complete, and drivers are not adhering to the reduced speed limit and damaging their 
vehicles. Mr. Randall explained that if there is an unsafe condition in the roadway, the city 
could be held liable. Asst. City Attorney Jeffrey Tucker stated that the ambiguity of the 
Milton case makes this issue a little more complicated. The ideas of more signage, rumble 
strips, and Georgia State Patrol were mentioned. It was suggested that this be tabled 
indefinitely.  
  
AGR2025-001: Mr. Randall explained that with AGR2023-015, the City entered into a 
Framework Agreement with Cobb County DOT to administer the plan development 
process for the South Cobb Improvement project until such time as Smyrna attains its 
Locally Administered Project certification. The City has now attained that certification, and 
will start administering the project directly with the commencement of the Preliminary 
Design Phase of the GDOT Plan Development Process. This agreement is to complete 
the tasks that have not been started under the Cobb County DOT oversight phase. The 
funds are part of the 2022 SPLOST project list. 
 
5. Other Business / Staff Comment 
 
Mayor Norton stated that at this moment, the retreat is still on. They will make a decision by noon 
tomorrow once weather issues have been confirmed. If the retreat is canceled, they will still meet 
later this week at City Hall, and they will reschedule the retreat. 
  
Mayor Pro Tem Gould said they had a well-attended and engaging town hall. He thanked Andrea 
Worthy, Economic Development Director, for a great job.