units above 1,680 sq. ft. of office space. The multi-family units will have garage units 
at the rear of the building and parking for the office units are located in front of the 
building. A total of 7 parking spaces are provided for the (2) office units and a two-car 
garage is provided for each multi-family unit. A guest parking space is provided for the 
multi-family units as well. Planning and Zoning Commission voted to approve this with 
a vote of 6-0 at the March 9, 2026 meeting.  
  
The proposed development will be accessed by the alleyway perpendicular to Roswell 
Street. The office parking spaces will have a full-access drive in the front, and the 
multi-family units will have a full-access drive to the rear of the building where the two-
car garages are located. 
  
There will be an underground stormwater detention facility for the development. 
  
Community Development recommends approval of the rezoning from GC to MU-
Conditional on 0.28 acres for a three-story building with three multi-family units and 
1,680 sq. ft. of office space, with the following conditions: 
  
Standard Conditions 
Requirements # 2, 3, 4, 8, 16 and 17 from Section 1201 of the Zoning Code are 
not applicable. The following requirements remain applicable.  
1. The composition of the mixed-use building shall include a mixture of elements 
including; but not limited to: brick, stone, shake, hardy plank and stucco. No 
elevation shall be comprised of 100 percent hardy plank siding. The 
residences along external roadways shall not be permitted to utilize hardy 
plank for any elevation facing these roads. 
2. The storm water detention plan shall be designed to create at least a ten 
percent reduction in a 100-year storm event. The city engineer shall approve 
all plans. 
3. All utilities within the development shall be underground. 
4. The developer shall be responsible for any traffic improvements (including 
additional right-of-way dedications) deemed necessary by either the City or the 
County during construction plan review. Sidewalks shall be provided by the 
developer inside the subdivision and outside the subdivision adjacent to any 
public right-of-way consistent with City’s requirements for the extent of the 
development. A grass buffer with a minimum width of 2’ shall be provided 
between the back of curb and sidewalk. 
5. No debris may be buried on any lot or common area. 
6. The developer will install decorative streetlights within the development, 
subject to approval by the city engineer. Utilization of low intensity, 
environmental type lighting, the illumination of which shall be confined within 
the perimeter of the subject property through the use of "full-cutoff lighting". 
7. The developer will comply with the City’s current tree ordinance. All required 
tree protection measures shall be adhered to by the developer during 
construction. 
8. All landscape plans must be prepared, stamped, and signed by a Georgia 
Registered Landscape Architect for any common areas or entrances. 
9. All yards and common areas are to be sodded, and landscaped. Irrigate as 
appropriate.                                                                                                         
Special Conditions 
10. The development shall maintain the following building setbacks: 
Minimum: 
Front – 0’ 
Side – 0’