GovernSmyrna.

Mayor and Council Meeting - A. Max Bacon City Hall - Council Chambers — Minutes

Open official source ↗ · Source page 7

SHA-256 7c7e681d24d8bd0f5ae35a1ac30a8d329769aadfdac483919b661b3ffedfcb94 · Captured source extract

 
February 16, 2026 
7:00 PM 
 
City of Smyrna 
Mayor and Council Meeting 
2800 King Street SE 
Council Chambers 
 
   Page 7 of 16 
7. The developer will comply with the City’s current tree ordinance. All required 
tree protection measures shall be adhered to by the developer during 
construction.  
8. All landscape plans must be prepared, stamped, and signed by a Georgia 
Registered Landscape Architect for any common areas or entrances.  
9. All yards and common areas are to be sodded, and landscaped. Irrigate as 
appropriate. Special Conditions  
10. The development shall maintain the following building setbacks from the 
Mixed-Use District:  
Commercial Minimum Setbacks:  
Front – 0’  
Side – 0’  
Rear – 20’  
 
Commercial Maximum Building Setbacks:  
Front – 95’  
Side – 20’  
 
Townhome Minimum Setbacks:  
Front – 25’  
Side – 12’  
Rear – 30’  
11. The developer shall meet all fire access requirements deemed necessary by 
the Fire Marshal during construction plan review.  
12. The developer shall be responsible for any water and sewer improvements 
deemed necessary by the Public Works Director during construction plan 
review.  
13. The developer shall be responsible for any stormwater improvements deemed 
necessary by the City Engineer.  
14. The developer shall provide a 5’ sidewalk with 2’ grass strip along S Cobb 
Drive and Oakdale Road for the length of the development. There shall be 
sidewalk connection from the public sidewalk to each building.  
15. Prior to the issuance of a Land Disturbance Permit the site plan shall be 
reviewed by Georgia Department of Transportation (GDOT).  
16. The development shall not be gated.  
17. A dedicated right turn lane/deceleration lane will be required for the entrance 
on SR 280. The right turn lane will need to be off the existing lanes on SR 280 
and three existing through lanes on SR 280 will need to be maintained, or as 
otherwise required by Georgia Department of Transportation.  
18. An acceleration lane will be required for the exit on SR 280. The hatching on 
the recently submitted site plan will need to be removed. Please maintain the 
existing roadway geometry on SR 280, or as otherwise required by Georgia 
Department of Transportation.  
19. A deceleration lane will be required for the commercial property entrance on 
Oakdale Road.  
20. A right-turn lane on Oakdale Rd at S Cobb Drive will be required.  
21. Install right-turn overlaps for the eastbound right-turn and southbound right-
turn phases at the intersection of Highlands Pkwy and S Cobb Dr.  
22. Install an additional eastbound left-turn lane (via restriping or widening) so the 
approach provides two (2) exclusive left-turn lanes, one (1) shared 
leftturn/through lane, and one (1) right-turn lane at the intersection of 
Highlands Pkwy and S Cobb Dr.  
23. Tree removal will be required for any trees within the sight distance triangle on 
Oakdale Road.