A Max Bacon
City Hall
2800 King Street
Smyrna, GA 30080 
32. The developer shall be responsible for any water and sanitary sewer improvements deemed 
necessary by the Public Works Director during construction plan review.
33. The developer shall be responsible for any fire access improvements deemed necessary by the 
Fire Marshal during construction plan review. 
34. All trees within the limits of disturbance and not located within a tree protection area must be 
removed during the land clearing and grading phase of the development.
35. Approval of the subject property for the RDA zoning district shall be conditioned upon the 
development of the property in substantial compliance with the site plan submitted 3/14/2025 
created by Planners and Engineers DGM Land Planning Consultants and all zoning stipulations above.
36. The applicant shall be bound to the elevations submitted and dated  3/14/2025 and the exterior 
side wall elevations on 4/2/2025. Approval of any change to the elevations must be obtained from the 
Director of Community Development.
37. Additional evergeen trees shall be planted in the landscape buffer with a minimum of 3-inch 
caliper.
38. The minimum driveway length shall be 20 feet from the garage face to back of curb for Lots 1-3, 
and 22’ for Lots 4-12.
39. The maximum building height shall be 38 feet measured from the average elevation of the ground 
on all four sides to the midpoint between the eaves of the ridge on a sloped roof.
40. Each home shall have a covered rear deck and the supporting posts shall be made of brick.
41. The external side elevation for Lot 6 shall be all brick, and the external side elevations for Lots 1, 7, 
and 12 shall be a minimum one story of brick.