Issue Sheet ATH2025-113
Open official source ↗ · Source page 1
City of Smyrna Issue Sheet File Number: 2025-261 A Max Bacon City Hall 2800 King Street Smyrna, GA 30080 3 4 0 8 5 Agenda Date: 7/21/2025 In Control: City Council File Type: General ID Agenda Section: Formal Business Department: Parks and Recreation Agenda Title: Authorization to approve the Tolleson Park Bridge & Trail Improvement Project (RFP 25-025) to include demolition and replacement of a concrete sidewalk and two pedestrian bridges at a cost of $329,270.00 to be paid from the 2022 SPLOST Beautification/Trails line item awarded to S.H. Creel Contracting, LLC (756 White Blossom Ct. Powder Springs, GA 30127) and authorize the Mayor to sign and execute all related documents. Ward 3 Councilmember - Travis Lindley ISSUE AND BACKGROUND: Currently, the two pedestrian bridges at Tolleson Park are in disrepair and need improvement. Nine proposals were received for the RFP and each company was evaluated on relevant experience, methodology, approach, staffing and references from previous clients. After careful consideration, the recommended firm, S.H. Creel Contracting, LLC, is the low bidder at $329,270.00. The project includes demolition and replacement of a concrete sidewalk and two pedestrian bridges with associated grading improvements that are necessary to ensure the safety of patrons using the areas affected. This project is funded by 2022 SPLOST Beautification/Trails and will be managed by Foresite Group, LLC. RECOMMENDATION / REQUESTED ACTION: Parks & Recreation recommend authorization to approve the Tolleson Park Bridge & Trail Improvement Project (RFP 25-025) to include demolition and replacement of a concrete sidewalk and two pedestrian bridges at a cost of $329,270.00 to be paid from the 2022 SPLOST Beautification/Trails line item awarded to S.H. Creel Contracting, LLC (756 White Blossom Ct. Powder Springs, GA 30127) and authorize the Mayor to sign and execute all related documents.