2026-07-20 July 20, 2026 Mayor and Council Meeting Minutes - FINAL
Open official source ↗ · Source page 5
July 20, 2026 7:00 PM City of Smyrna Mayor and Council Meeting 2800 King Street SE Council Chambers Page 5 of 12 Also, the open space for the development was moved to the southwest corner and the stormwater detention was shifted closer to Argo Road. These site plan modifications were in response to concerns about the stormwater facility being too close to the Woodland Brooke subdivision, and the open space being too close to the Camp Highland Rd. & Argo Rd. intersection. These modifications resulted in the reduction of guest parking spaces from 8 to 7 spaces. The elevations have been modified as well by incorporating brick façade elements and articulated building massing providing more traditional aesthetic than the previous elevations. The upper decks have been moved from the front of the building to the rear of the building, Transportation Review A traffic impact study was provided by the applicant that expects the six townhomes to: generate approximately 42 vehicle trips per day. Based on the anticipated traffic generation, the proposed six-townhome development is not expected to create significant impacts on Camp Highland Road, Argo Road or the surrounding roadway network. The projected increase in vehicle trips is minimal and well within the capacity of the existing roadways. Based upon the review of the development by the Transportation Engineer, the city will require a 5 ft. sidewalk and 2 ft. grass strip along Camp Highland Road and Argo Road. Additionally, the Transportation Engineer will require a raised crosswalk across Camp Highland Road with ADA ramps and flashing beacon. Community Development recommends approval of the rezoning from GC to TD- Conditional on 1.05 acres for six (6) single-family attached dwelling units at a density of 5.71 units per acre with the following conditions: Standard Conditions Requirements # 2, 3, 4, 8, 16 and 17 from Section 1201 of the Zoning Code are not applicable. The following requirements remain applicable. • Composition of the Buildings • Underground Utilities • Traffic Improvements • No Burying of Construction Debris • Low Intensity – Full Cut-Off Lighting • Tree Ordinance • Landscape Plans • Sodded and Landscaped Common Areas • Tree Planting Requirements Special Conditions: • Minimum Camp Highland front setback reduction to 10’ • Minimum Argo Road front setback reduction to 20’ • Responsible for Fire Access, Water & Sewer, and Stormwater improvements • Install 5’ sidewalk and 2’ grass strip along road frontage • Minimum seven (7) parking spaces • Maximum sic (6) townhomes with two (2) car garages • Provide Right-of-Way dedication on Argo Road • Provide raised crosswalk with flashing beacon • Approval is conditioned to the submitted site plan and elevations