Committee of the Whole Work Session Meeting — Minutes

Open official source ↗ · Source page 2

SHA-256 b9b5728082110a978d290394a4bd61c14b61c892fe63d29ab1e018047a80e87b · Captured source extract

 
March 12, 2026 
6:00 PM 
 
City of Smyrna 
Mayor and Council Meeting 
2800 King Street SE 
Human Resources Training Room 
 
Page 2 of 5 
 
  
The applicant is requesting approval to subdivide property at 2773 Mildred Place into two 
(2) single-family residential lots. The applicant plans to subdivide the property within the 
requirements of the R15 zoning district, so no rezoning is required. The subject property is 
0.89 acres with a proposed density of 2.24 units/acre which is within the Low Density 
Residential land use classification (under 3 units/acre). The proposed subdivision will 
result in two (2) lots being 23,408 sq. ft. and 16,793 sq. ft. in size. The existing home will 
remain and one (1) new lot will be created. The new lot (Lot 2) meets most of the R-15 
zoning requirements, however, one variance is requested to reduce the lot width from 85’ 
to 75’. The Planning & Zoning Commission recommended approval by a vote of 6-0 at the 
March 9, 2026, meeting. 
  
Ordinance Revisions: Scott Cochran, City Attorney, explained that there are going to be 
a total of five ordinance revisions, including updates for mobile food vendors, bail 
bondsmen, tattoo establishments, precious metal dealers, and the film industry. The 
updates include standard application processes, appeal rights, and procedures for 
suspending or revoking permits. These revisions will bring them consistent with state 
laws, such as a seven-day hold for precious metal dealers.  
  
 Z25-015: Mark Wolff, City Engineer, presented the following: 
  
Arris Smyrna Traffic Impact Analysis  
• Prepared by Kinley Horn 
• Submitted 3/9/2026, Revised 3/12/2026 
• Analysis of anticipated traffic impacts associated with proposed Arris Smyrna 
development 
• Studies six (6) intersections 
o Est. 2021 Traffic Conditions 
o Projected 2027 “No-Build” & “Build” Conditions 
o Horizon Year 2037 “No Build” & “Build” Conditions 
 
Study Area & Intersections  
• Roadway characteristics 
• Crash history 
• Existing traffic volumes 
• Pedestrian movements 
• Multimodal considerations 
• Non-Project future roadway improvements 
• Project 
o Site access 
o Intersection sight distance 
o Trip generation 
o Trip distribution & assignment 
• Level-of-Service analysis 
• GDOT Intersection Control Evaluation (ICE) 
• Queuing analysis 
• System improvement recommendations 
• Site-access improvement recommendations 
 
Traffic Volumes  
• Used 2019 traffic count data 
• Adjusted for 2.5% annual growth 
• Applied adjustment factor for COVID