Project: 25122 Tolleson Park Aquatics Center
3530 King Springs Rd
Smyrna, Georgia 30080
 
 
RFI #23: Pool deck sloping @ Lap Pool
 
Revision 0 Status Open
To Luke T orbert (Croy Engineering) 
T om Robinson (Croy Engineering) 
From Alex Griffith (Reeves Young, LLC)
45 Peachtree Industrial Blvd., NW
Sugar Hill, Georgia 30518
Date Initiated Apr 15, 2026 Due Date Apr 20, 2026
Location Project Stage
Cost Impact TBD Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings 
Received From  
Copies To Levi Carter (Rays Concrete), Semmes Irby (Reeves
Young, LLC), Josh Milford (Milford Excavating, Inc.),
Brent Newman (Reeves Young, LLC), Corey Porter
(Waterworks Atlanta, Inc.), Blaine Russell (Reeves
Young, LLC) 
 
 
Activity
 
Question Question from Alex Griffith Reeves Young, LLC on Wednesday, Apr 15, 2026 at 11:09 AM EDT
  Per drawing C-500 the corners of the pool deck at the lap pool are called out to be 1017.15. The deck is called to slope away
from the pool on all sides of the pool except for the north/building side. With the slab elevation at 1017.25 and the pool
corners at 1017.15 we have roughly 0.28% of fall over the 36.5' span towards the lap pool. 
 
This will not be acceptable per the Cobb County rules and regulations Part 8) section 1). 
 
Please advise.
  Attachments
pool deck RFI C-500_ GRADING AND DRAINAGE PLAN Rev.2.pdf
 
Official ResponseResponse from Luke Torbert Croy Engineering on Wednesday, Apr 29, 2026 at 02:44 PM EDT
  See attached exhibit for clarification. Please let us know if further clarification is needed.
  Attachments
Pool Deck Sloping at Lap Pool and Main Bldg Clarification.pdf
 
All Replies Response from Luke Torbert Croy Engineering on Wednesday, Apr 29, 2026 at 02:44 PM EDT
  See attached exhibit for clarification. Please let us know if further clarification is needed.