GovernSmyrna.

25122--Tolleson-Park-Aquatics-Center-002-PCCO-#002-July-2026_CroySigned

Open official source ↗ · Source page 57

SHA-256 c31c4bee4f5ca172e0868b403f9bd2686b51a3f87b36bd2bec0f2ad0838008cc · Captured source extract

ESTIMATE
J & I Cordon Electric, LLC
2996 Lawrenceville Hwy
Lawrenceville, Georgia 30044
quickbooks@cordonelectric.com
+1 (770) 682-1706
www.cordonelectric.com
Bill to
REEVES + YOUNG
REEVES + YOUNG
45 Peachtree Industrial Boulevard
Sugar Hill, GA 30518
Estimate details
Estimate no.: 26020
Estimate date: 05/05/2026
Expiration date: 06/09/2026
Project Number: 2625466
Description Qty Rate Amount
TOLLESON PARK AQUATIC CENTER
Change Order #1 - as Requested By (AGRIFFITH) - Electrical
work required to maintain new restroom building power from
relocated site panel
1 $0.00 $0.00
MATERIAL:
PVC Pipe, Schedule 40, 2 in - 450'
PVC, 90° Elbow, 2 in x 2 in, Female NPT x Female NPT, 330 psi,
32° to 140° F - 4 Units
Wire THHN, 12 AWG, Black, Stranded Copper - 960'
Wire THHN, 10 AWG, Stranded Copper, Black - 1920'
20A/1P Siemens Molded-Case Breaker - 3 Units
20A/1P Siemens Tandem Breaker - 4 Units
3.0 in. x 1000 ft. Detectable Underground Tape Caution Buried
Electric Line, Red - 1 Unit
1 $2,522.85 $2,522.85
RENTAL:
(1) Mini Ex - 1 Day @ $540
(1) Skid Steer - 1 Day @ $545
1 $1,085.00 $1,085.00
LABOR:
5 Electricians working 10 Hours for 1 Day - Digging, laying
conduit, backfill
5 Electricians working 10 Hours for .5 Day - Pulling wire,
termination, and inspection
75 $65.00 $4,875.00
TAX: 6.0% 0.06 $3,607.85 $216.47
OH&P : 15% 0.15 $8,482.85 $1,272.43
10%
$869.93