something that needs to be signed to acknowledge those? Or are those just provided for 
information purposes. 
Provided for information only.   
 
14. Can a project boundary exhibit be provided to understand the general limits of work? 
On the Smyrna side, it is preferred, but not required that the bridge will connect to the 
City’s Riverline Park. On the Atlanta side it is preferred, but not required that the bridge 
will connect to the Chattahoochee Brick Company site. 
 
15. Is there a desired completion date we can compare the scheduling to? No 
16. Will Smyrna facilitate site access to perform site investigations on property not owned by 
the City of Smyrna? Yes 
 
17. Should the team assume the crossing location will definitively happen within the Smyrna 
city limits? If the study area extends beyond the city limits, please define upstream and 
downstream extents. Yes 
 
18. Is there any part of the RiverLands trail alignment that is included in the scope, or is the 
study only looking at Bridge alignments and site design at the landing points on either 
side? Only bridge alignments and site design 
 
19. To what extent will the City or TPL support the engagement efforts in terms of logistics, 
outreach, and advertisement?  The City and TPL will assist in outreach to stakeholder 
groups. 
 
20. The GDOT Concept Report typically requires only 10% level of design. Is the City of 
Smyrna looking for 30% Design Documentation of the bridge and landing sites in 
addition to the GDOT Concept report? Or is the 10% Design / GDOT Concept Report the 
final deliverable in this scope of work? Include 30% Design Documentation of the bridge 
and landing sites in addition to the GDOT Concept report in proposal, but as a separate 
line item in the bid. Include 30% Design Documentation of the bridge and landing sites in 
addition to the GDOT concept report in proposal, but as a separate line item in the bid. 
 
21. Can you please clarify the expected level of design for Task 4? A GDOT Concept Report 
is typically consistent with a 10% level of design, however, Task 4 in the RFP requests 
30% design which is consistent with Preliminary Design of GDOT’s PDP process. In 
other words, are you expecting both a GDOT Concept Report and a full Preliminary 
Design package as deliverables for this task? Include 30% Design Documentation of the 
bridge and landing sites in addition to the GDOT Concept report in proposal, but as a 
separate line item in the bid. Include 30% Design Documentation of the bridge and 
landing sites in addition to the GDOT Concept report in proposal, but as a separate line 
item in the bid. 
22. Has GODT already been engaged regarding this project? Is there an existing PI number? 
No 
23. Can you please confirm the extents of the study area for this project? On the Smyrna side, 
it is preferred, but not required that the bridge will connect to the City’s Riverline Park.