Skip to main content
SMYRNA, GEORGIA / IN THE MEETING ROOM

Meeting discussionsStart with a topic.

Find what was said, who said it, and the city business around it. Go from a topic to the original public record.

Choose a topic or browse the available passages below.
EXPLORE THE RECORD

Recent meeting passages

1,525–1,536 of 1,847
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

19. The developer shall provide right-of-way dedication on Campbell Road where required by the City Engineer. 20. The front elevations of Lots 1-6 shall face Campbell Road and the front elevations Lots 7-12 shall face the detention pond/open space area. The rear elevation shall be on the private street. 21. All homes shall have a two car rear-entry garage. 22. Privacy fencing shall be prohibited within the development. Fencing within the front yard shall be a maximum 4' in height and decorative. 23. The front entrance to the development shall not be gated. 24. The development shall include a 1 0' landscape strip along Atlanta Road. 25. The development shall include a 50' landscape buffer along the northern boundary. The landscape buffer will include a 6' high planted berm, and no trees taller than 15' within 20' of the property line.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

27. The existing detention pond will be modified by the developer to be an amenity feature with a passive recreational area; including walking trails and landscaping in accordance with the site plan dated 10/19/2021.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

30. The shared sidewalk and road connections with the church property will be installed and constructed by the developer as shown on the 10/19/2021 site plan.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

32. The developer shall be responsible for any water and sanitary sewer improvements deemed necessary by the Public Works Director during construction plan review.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

34. All trees within the limits of disturbance and not located within a tree protection area must be removed during the land clearing and grading phase of the development.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

35. Approval of the subject property for the RDA zoning district shall be conditioned upon the development of the property in substantial compliance with the site plan submitted 10/19/2021 3/14/2025 created by Planners and Engineers DGM Land Planning Consultants and all zoning stipulations above. 36. The applicant shall be bound to the elevations submitted and dated 6/2/2021 3/14/2025 and the exterior side wall elevations on 4/2/2025. Approval of any change to the elevations must be obtained from the Director of Community Development.
Speaker, agenda context & source details
Meeting minutes · summary

Committee of the Whole Meeting - A. MAX BACON CITY HALL, HR TRAINING ROOM

Summary in the published minutes, not a verbatim quotation.

37. Additional evergeen trees shall be planted in the landscape buffer with a minimum of 3-inch caliper. 38. The minimum driveway length shall be 20 feet from the garage face to back of curb for Lots 1-3, and 22' for Lots 4-12. 39. The maximum building height shall be 38 feet measured from the average elevation of the ground on all four sides to the midpoint between the eaves of the ridge on a sloped roof.
Speaker, agenda context & source details
READ THE WORDS. CHECK THE CONTEXT.

What this search can tell you

Coverage is incomplete. This collection tracks 118 meetings. 39 have searchable transcripts and 72 have searchable minutes; a meeting may have both. 10 currently have neither. A missing passage is not evidence that a topic was never discussed.

Speech and summaries stay distinct. Transcript passages preserve the available transcript text. Minutes are labeled as summaries, not spoken quotations. Speaker identities are shown only where the source or documented attribution supports them; an unattributed speaker remains unattributed.

Relevance does not establish a connection. Topic search uses meaning and words to help you locate passages. Read adjacent passages, follow the source and inspect any agenda context before drawing a conclusion about an official’s position or a decision.

Verify a passage

Each passage links to its source, with an available page or recording time. Read the surrounding context and compare the captured text with the original public record.

How to verify a citation