Skip to main content

25122--Tolleson-Park-Aquatics-Center-002-PCCO-#002-July-2026_CroySigned

Open official source ↗ · Source page 42

Text from the cited document · page 42

Document text may contain formatting or transcription errors. Use the original document to check the wording.

Reeves Young
45 Peachtree Industrial Blvd
Sugar Hill, Georgia 30518
P: (770) 271-1159
Project: 25122- Tolleson Park Aquatics Center
3530 King Springs Rd
Smyrna, Georgia 30080
 
 
RFI #16 (Revision 1): Curtainwall Head Attachment - Envelope Coordination
Meeting
 
Revision 1 Status Open
To Brian Lachat (Nelson/Nelco Architecture, Inc.) 
Jazzmin Reid (Nelson/Nelco Architecture, Inc.)
 (Response Required)
From Semmes Irby (Reeves Young, LLC)
45 Peachtree Industrial Blvd., NW
Sugar Hill, Georgia 30518
Date Initiated May 13, 2026 Due Date May 18, 2026
Location Project Stage Course of Construction
Cost Impact Schedule Impact
Spec Section 08 4413 - Glazed Aluminum CurtainwallsCost Code
Drawing Number Reference
Linked Drawings 
Received From Keith T aylor (Contractors Glass LLC)
Copies To  
 
 
Activity
 
Question Question from Semmes Irby Reeves Young, LLC on Wednesday, May 13, 2026 at 03:22 PM EDT
  Per Envelope Coordination Meeting held on 5/13, it is RY's understanding that blocking is to be wrapped in aluminum
cladding to match storefront finish (Java Brown). There is too much variation in stone thickness for sealant bead. Stone will
terminate into cladding.
 
Please confirm acceptability.
 
  Awaiting an Official Response
 
 
Reeves Young Page 1 of 1 Printed On: May 21, 2026 10:31 AM EDT
   
CONFIRMING THE ACCEPTABILITY OF THE ABOVE.  PLEASE SEE BELOW REVISED DETAIL
2/A-12.03 SHOWING THE ALUMINUM CLADDING. 
JR
NELSON
5.22.2026
Verification options

Compare the document date, page and passage with the publisher’s original.

Download source verification details